|
DNV Service Specifications, Standards and Recommended Practices |
|
Valid as of April 2013
|
[View archive by document]
| Valid from April 2013 (current) |
| |
PDF Edition |
|
| |
| Summary and Status |
Choices (top of page) |
| Changes |
Summary of changes and current document status |
April 2013 |
Rev |
| Note: |
"Summary of changes" replaces "Amendments and Corrections" as of October 2010. |
|
| |
| Service Specifications |
Choices (top of page) |
| DNV-DSS-105 |
Rules for Classification of Diving Systems |
July 2012 |
|
| DNV-DSS-314 |
Verification of Hydrocarbon Refining and Petrochemical Facilities |
April 2012 |
|
| DNV-DSS-315 |
Verification of Onshore LNG and Gas Facilities |
April 2012 |
|
| DNV-DSS-401 |
Technology Qualification Management |
December 2012 |
|
| DNV-DSS-402 |
Qualification Management for Geological Storage of CO2 |
June 2012 |
|
| DNV-DSS-904 |
Type Certification of Wind Turbines |
February 2013 |
Rev |
| |
| Offshore Service Specifications |
Choices (top of page) |
| DNV-OSS-101 |
Rules for Classification of Offshore Drilling and Support Units |
October 2012 |
|
| DNV-OSS-102 |
Rules for Classification of Floating Production, Storage and Loading Units |
April 2012 |
|
| DNV-OSS-103 |
Rules for Classification of LNG/LPG Floating Production and Storage Units or Installations |
April 2012 |
|
| DNV-OSS-104 |
Rules for Classification of Self-Elevating Units |
April 2012 |
|
| DNV-OSS-121 |
Classification Based on Performance Criteria Determined from Risk Assessment Methodology |
October 2011 |
|
| DNV-OSS-201 |
Verification for Compliance with Norwegian Shelf Regulations |
October 2012 |
|
| DNV-OSS-202 |
Verification for Compliance with UK Shelf Regulations |
October 2011 |
|
| DNV-OSS-300 |
Risk Based Verification |
April 2012 |
|
| DNV-OSS-301 |
Certification and Verification of Pipelines |
April 2012 |
|
| DNV-OSS-302 |
Offshore Riser Systems |
April 2012 |
|
| DNV-OSS-304 |
Risk Based Verification of Offshore Structures |
April 2012 |
|
| DNV-OSS-306 |
Verification of Subsea Facilities |
April 2012 |
|
| DNV-OSS-307 |
Verification of Process Facilities |
April 2012 |
|
| DNV-OSS-308 |
Verification of Lifting Appliances for the Oil and Gas Industry |
April 2012 |
|
| DNV-OSS-312 |
Certification of Tidal and Wave Energy Converters |
April 2012 |
|
| DNV-OSS-313 |
Pipe Mill and Coating Yard - Qualification |
October 2011 |
|
| DNV-OSS-901 |
Project Certification of Offshore Wind Farms |
June 2012 |
|
| |
| Standards |
Choices (top of page) |
| DNV-DS-E403 |
Standard for Surface Diving Systems |
July 2012 |
|
| DNV-DS-J102 |
Design and Manufacture of Wind Turbine Blades, Offshore and Onshore Wind Turbines |
November 2010 |
|
| |
| Offshore Standards |
Choices (top of page) |
| DNV-OS-A101 |
Safety Principles and Arrangements |
April 2011 |
|
| DNV-OS-B101 |
Metallic Materials |
October 2012 |
|
| DNV-OS-C101 |
Design of Offshore Steel Structures, General (LRFD Method) |
April 2011 |
|
| DNV-OS-C102 |
Structural Design of Offshore Ships |
October 2012 |
|
| DNV-OS-C103 |
Structural Design of Column Stabilised Units (LRFD Method) |
October 2012 |
|
| DNV-OS-C104 |
Structural Design of Self-Elevating Units (LRFD Method) |
April 2012 |
|
| DNV-OS-C105 |
Structural Design of TLPs (LRFD Method) |
April 2011 |
|
| DNV-OS-C106 |
Structural Design of Deep Draught Floating Units (LRFD Method) |
April 2012 |
|
| DNV-OS-C201 |
Structural Design of Offshore Units (WSD Method) |
October 2012 |
|
| DNV-OS-C301 |
Stability and Watertight Integrity |
April 2012 |
|
| DNV-OS-C401 |
Fabrication and Testing of Offshore Structures |
April 2013 |
Rev |
| DNV-OS-C501 |
Composite Components |
October 2010 |
|
| DNV-OS-C502 |
Offshore Concrete Structures |
September 2012 |
|
| DNV-OS-C503 |
Concrete LNG Terminal Structures and Containment Systems |
October 2010 |
|
| DNV-OS-D101 |
Marine and Machinery Systems and Equipment |
October 2012 |
|
| DNV-OS-D201 |
Electrical Installations |
April 2011 |
|
| DNV-OS-D202 |
Automation, Safety, and Telecommunication Systems |
October 2008 |
|
| DNV-OS-D203 |
Integrated Software Dependent System (ISDS) |
December 2012 |
|
| DNV-OS-D301 |
Fire Protection |
October 2009 |
|
| DNV-OS-E101 |
Drilling Plant |
October 2009 |
|
| DNV-OS-E201 |
Oil and Gas Processing Systems |
April 2013 |
Rev |
| DNV-OS-E301 |
Position Mooring |
October 2010 |
|
| DNV-OS-E302 |
Offshore Mooring Chain |
October 2009 |
|
| DNV-OS-E303 |
Offshore Fibre Ropes |
February 2013 |
Rev |
| DNV-OS-E304 |
Offshore Mooring Steel Wire Ropes |
October 2009 |
|
| DNV-OS-E401 |
Helicopter Decks |
April 2012 |
|
| DNV-OS-E402 |
Offshore Standard for Diving Systems |
October 2010 |
|
| DNV-OS-E403 |
Offshore Loading Buoys |
October 2008 |
|
| DNV-OS-E406 |
Design of Free Fall Lifeboats |
April 2010 |
|
| DNV-OS-E407 |
Underwater Deployment and Recovery Systems |
October 2012 |
|
| DNV-OS-F101 |
Submarine Pipeline Systems |
August 2012 |
|
| DNV-OS-F201 |
Dynamic Risers |
October 2010 |
|
| DNV-OS-H101 |
Marine Operations, General |
October 2011 |
|
| DNV-OS-H102 |
Marine Operations, Design and Fabrication |
January 2012 |
|
| DNV-OS-H201 |
Load Transfer Operations |
April 2012 |
|
| DNV-OS-H203 |
Transit and Positioning of Offshore Units |
February 2012 |
|
| DNV-OS-J101 |
Design of Offshore Wind Turbine Structures |
February 2013 |
Rev |
| DNV-OS-J201 |
Offshore Substations for Wind Farms |
October 2009 |
|
| DNV-OS-J301 |
Rules for Classification of Wind Turbine Installation Units |
April 2013 |
Rev |
| |
| Recommended Practices |
Choices (top of page) |
| DNV-RP-A201 |
Plan Approval Documentation Types – Definitions |
April 2012 |
|
| DNV-RP-A203 |
Qualification of New Technology |
December 2012 |
|
| DNV-RP-A204 |
Quality Survey Plan (QSP) for Offshore Class New-building Surveys |
September 2011 |
|
| DNV-RP-A205 |
Offshore Classification Projects - Testing and Commissioning |
March 2012 |
|
| DNV-RP-B101 |
Corrosion Protection of Floating Production and Storage Units |
April 2007 |
|
| DNV-RP-B401 |
Cathodic Protection Design |
April 2011 |
|
| DNV-RP-C101 |
Allowable Thickness Diminution for Hull Structure of Offshore Ships |
April 2007 |
|
| DNV-RP-C102 |
Structural Design of Offshore Ships |
February 2002 |
|
| DNV-RP-C103 |
Column-Stabilised Units |
April 2012 |
|
| DNV-RP-C104 |
Self-elevating Units |
November 2012 |
|
| DNV-RP-C201 |
Buckling Strength of Plated Structures |
October 2010 |
|
| DNV-RP-C202 |
Buckling Strength of Shells |
January 2013 |
Rev |
| DNV-RP-C203 |
Fatigue Design of Offshore Steel Structures |
October 2012 |
|
| DNV-RP-C204 |
Design against Accidental Loads |
October 2010 |
|
| DNV-RP-C205 |
Environmental Conditions and Environmental Loads |
October 2010 |
|
| DNV-RP-C206 |
Fatigue Methodology of Offshore Ships |
October 2012 |
|
| DNV-RP-C207 |
Statistical Representation of Soil Data |
January 2012 |
|
| DNV-RP-C301 |
Design, Fabrication, Operation and Qualification of Bonded Repair of Steel Structures |
April 2012 |
|
| DNV-RP-C302 |
Risk Based Corrosion Management |
April 2012 |
|
| DNV-RP-D101 |
Structural Analysis of Piping Systems |
October 2008 |
|
| DNV-RP-D102 |
Failure Mode and Effect Analysis (FMEA) of Redundant Systems |
January 2012 |
|
| DNV-RP-D201 |
Integrated Software Dependent Systems |
October 2009 |
|
| DNV-RP-E101 |
Recertification of Well Control Equipment for the Norwegian Continental Shelf |
January 2012 |
|
| DNV-RP-E102 |
Recertification of Blowout Preventers and Well Control Equipment for the US Outer Continental Shelf |
June 2010 |
|
| DNV-RP-E301 |
Design and Installation of Fluke Anchors in Clay |
May 2012 |
|
| DNV-RP-E302 |
Design And Installation of Plate Anchors in Clay |
December 2002 |
|
| DNV-RP-E303 |
Geotechnical Design and Installation of Suction Anchors in Clay |
October 2005 |
|
| DNV-RP-E304 |
Damage Assessment of Fibre Ropes for Offshore Mooring |
April 2005 |
|
| DNV-RP-E306 |
Dynamic Positioning Vessel Design Philosophy Guidelines |
September 2012 |
|
| DNV-RP-E307 |
Dynamic Positioning Systems - Operation Guidance |
January 2011 |
|
| DNV-RP-E401 |
Survey of Diving Systems |
April 2007 |
|
| DNV-RP-E402 |
Naval Rescue Submersibles |
October 2010 |
|
| DNV-RP-E403 |
Hyperbaric Evacuation Systems |
October 2010 |
|
| DNV-RP-F101 |
Corroded Pipelines |
October 2010 |
|
| DNV-RP-F102 |
Pipeline Field Joint Coating and Field Repair of Linepipe Coating |
May 2011 |
|
| DNV-RP-F103 |
Cathodic Protection of Submarine Pipelines by Galvanic Anodes |
October 2010 |
|
| DNV-RP-F105 |
Free Spanning Pipelines |
February 2006 |
|
| DNV-RP-F106 |
Factory Applied External Pipeline Coatings for Corrosion Control |
May 2011 |
|
| DNV-RP-F107 |
Risk Assessment of Pipeline Protection |
October 2010 |
|
| DNV-RP-F108 |
Fracture Control for Pipeline Installation Methods Introducing Cyclic Plastic Strain |
January 2006 |
|
| DNV-RP-F109 |
On-Bottom Stability Design of Submarine Pipelines |
November 2011 |
|
| DNV-RP-F110 |
Global Buckling of Submarine Pipelines Structural Design due to High Temperature/High Pressure |
October 2007 |
|
| DNV-RP-F111 |
Interference Between Trawl Gear and Pipelines |
October 2010 |
|
| DNV-RP-F112 |
Design of Duplex Stainless Steel Subsea Equipment Exposed to Cathodic Protection |
October 2008 |
|
| DNV-RP-F113 |
Pipeline Subsea Repair |
October 2007 |
|
| DNV-RP-F116 |
Integrity Management of Submarine Pipeline Systems |
October 2009 |
|
| DNV-RP-F118 |
Pipe Girth Weld AUT System Qualification and Project Specific Procedure Validation |
October 2010 |
|
| DNV-RP-F201 |
Design of Titanium Risers |
October 2002 |
|
| DNV-RP-F202 |
Composite Risers |
October 2010 |
|
| DNV-RP-F203 |
Riser Interference |
April 2009 |
|
| DNV-RP-F204 |
Riser Fatigue |
October 2010 |
|
| DNV-RP-F205 |
Global Performance Analysis of Deepwater Floating Structures |
October 2010 |
|
| DNV-RP-F206 |
Riser Integrity Management |
April 2008 |
|
| DNV-RP-F301 |
Subsea Separator Structural Design |
April 2007 |
|
| DNV-RP-F302 |
Selection and use of Subsea Leak Detection Systems |
April 2010 |
|
| DNV-RP-F401 |
Electrical Power Cables in Subsea Applications |
February 2012 |
|
| DNV-RP-G101 |
Risk Based Inspection of Offshore Topsides Static Mechanical Equipment |
October 2010 |
|
| DNV-RP-G103 |
Non-Intrusive Inspection |
January 2011 |
|
| DNV-RP-H101 |
Risk Management in Marine and Subsea Operations |
January 2003 |
|
| DNV-RP-H102 |
Marine Operations during Removal of Offshore Installations |
April 2004 |
|
| DNV-RP-H103 |
Modelling and Analysis of Marine Operations |
December 2012 |
|
| DNV-RP-H104 |
Ballast, Stability, and Watertight Integrity - Planning and Operating Guidance |
September 2011 |
|
| DNV-RP-J101 |
Use of Remote Sensing for Wind Energy Assessments |
November 2011 |
|
| DNV-RP-J201 |
Qualification Procedures for CO2 Capture Technology |
April 2010 |
|
| DNV-RP-J202 |
Design and Operation of CO2 Pipelines |
April 2010 |
|
| DNV-RP-J203 |
Geological Storage of Carbon Dioxide |
April 2012 |
|
| DNV-RP-O401 |
Safety and Reliability of Subsea Systems |
April 1985 |
|
| DNV-RP-O501 |
Erosive Wear in Piping Systems |
January 2011 |
|
| DNV-RP-U301 |
Risk Management of Shale Gas Developments and Operations |
January 2013 |
New |
[View archive by document]
Published by DNV Rules and Standards (TGTNO831)
Updated: 2013-05-23