DNV-OS-C201 Structural Design of Offshore Units (WSD method)
|
Sec.14
M 600 Unintended flooding
Sec.14 M
601 A procedure describing actions to be taken after relevant
unintended flooding shall be prepared. Unintended filling of hard
tanks, collision ring and bracings for a DDF will be the most relevant
scenarios for the operation phase.
Sec.14 M
602 It must be ensured that counter-filling of tanks and unit
uprighting can be performed safely and without delays.
Sec.14 M
603 Structural aspects related to the tilted condition and counter-flooding
(if relevant) shall be investigated. This applies to the complete
unit including risers and mooring system.
Sec.14 M
604 If the unit can not be brought back to the design draught
and verticality by counter-ballasting and redistribution of ballast
water, this must be taken into account in design of the unit.