Sec.1
C. How to use the standard

Sec.1
C 100   Users of the standard

Sec.1 C
101
   The client is understood to be the party ultimately responsible for the system as installed and its intended use in accordance with the prevailing laws, statutory rules and regulations.

Sec.1 C
102
   The authorities are the national or international regulatory bodies.

Sec.1 C
103
   The contractor is understood to be the party contracted by the client to perform all or part of the necessary work needed to bring the system to an installed and operable condition.

Sec.1 C
104
   The designer is understood to be the party contracted by the contractor to fulfil all or part of the activities associated with the design.

Sec.1 C
105
   The manufacturer is understood to be the party contracted by the contractor to manufacture all or part of the system. Two types of manufacturers can be distinguished: the material manufacturers, which supply the composite material or its constituents (i.e. resin, fibres) and the product manufacturers, which fabricate all or part of the system.

Sec.1 C
106
   The third party verifier is an independent neutral party that verifies the design of a structure or component.

Sec.1
C 200   Flow chart of the standard

raster

Fig. 1   Flow chart of the standard

Sec.1
C 300   How to use the standard

Sec.1 C
301
   All users should go through section 1 and section 2 describing the scope of the standard and the design principles.

Sec.1 C
302
   The client and contractor(s) should specify the Design Premises according to section 3.

Sec.1 C
303
   The design analysis should be performed by the designer according to section 6, section 7, section 8, section 9 and section 10. The main input for the Design Report should come out of these sections.

Sec.1 C
304
   The contractor(s) and manufacturer(s) should specify the fabrication according to section 11.

Sec.1 C
305
   The client and contractor(s) should specify the installation and repair procedures according to section 12.

Sec.1 C
306
   The third party verifier should verify that the design documentation is according to the requirements of section 2E.