| — | all structural components, both steel and concrete,
primary and secondary |
| — | the mass of all intended equipment, consistent with
the stage being considered |
| — | the estimated mass of temporary items, such as storage, lay-down,
etc |
| — | masses of any fluids contained within the structure, including
equipment and piping contents, oil storage, LNG storage, flooding,
etc |
| — | the mass of solid ballast within the structure |
| — | snow and ice accumulation on the structure, if significant |
| — | drill cuttings or other deposits on the structure |
| — | the mass of marine growth and external water moving
with the structure |
| — | added water mass |
| — | added soil mass. |
NOTE Calculation of the added mass of external or entrained water
moving with the structure shall be based on best available published
information or suitable hydrodynamic analysis. In lieu of such analysis, this mass
may be taken as the fullmass of displaced water by small-submerged
members, reducing to 40% of the mass of displaced water
by larger structural members. Added mass effects may be ignored
along the axial length of prismatic members, such as the shafts.