The electronic pdf versions of the documents found through http://www.dnv.com/ are the officially binding versions. Copyright Det Norske Veritas.

[Book] [Expand] [Collapse] [Search Forms] [Previous Section with Hits] [Next Section with Hits] [Clear Search] [Help]

Expand Search


E400: Electrical conductivity [Table of Contents] E600: Pressure testing of plastic pipes

DNV-OS-D101 Marine and Machinery Systems and Equipment

[-] Ch.2: Technical Provisions
[-] Sec.6: Pipe Fabrication, Workmanship, and Testing
[-] E: Joining of Plastic Pipes
[-] E500: Quality control

Ch.2 Sec.6
E 500   Quality control

Ch.2 Sec.6 E
501
   The quality control shall be based on the implementation of:
bonding procedure qualification records
inspection of adhesive-bonded joints
inspection register for piping joints
inspection of finished fabricated pipework for compliance with design drawings.


Ch.2 Sec.6 E
502
   Each adhesive-bonded connection shall be permanently marked for identification purposes. A log book containing the following key values relevant for the bonding process shall be maintained:
date
temperature and relative humidity
identification number
curing temperature and time
signature of the quality inspector.

E400: Electrical conductivity [Table of Contents] E600: Pressure testing of plastic pipes