The electronic pdf versions of the documents found through http://www.dnv.com/ are the officially binding versions. Copyright Det Norske Veritas.

[Book] [Expand] [Collapse] [Search Forms] [Previous Section with Hits] [Next Section with Hits] [Clear Search] [Help]

Expand Search


[Table of Contents] Ch.1: Introduction

DNV-OS-E101 Drilling plant


Printable Version

DNV-OS-E101

Drilling Plant

October 2009


MAIN CHANGES

General

Clarifications and changes to some rules and categorizations are done to be more in line with technology development and practice. The WELL class notation is included as a separate section to show more clearly the differences between DRILL and WELL class notations.

Main changes

Insert of WELL class notation, new Ch.2 Sec.6
Small changes in testing chapter, new Ch.2 Sec.7
Some changes and shuffle in Ch.3 Sec.3 Tables A2, A3, A6 and A11
Minor changes in Ch.3 Sec.3 Tables A4, A5, A7, A8, A9 and A12
New man rider chapter, new Ch.2 Sec.5 I
Winches moved to new Ch.2 Sec.5 J. Old J deleted
Control system, Ch.2 Sec.4, revised. A lot removed and replaced by references to DNV-OS-D201 / DNV-OS-D202.
Piping chapter revised. Some deletion. Reference to DNV-RP-D101. New flexible hoses and pipe stress analysis parts in Ch.2 Sec.3
Update of tables in Ch.1 Sec.1
Materials: Bolt parts revised including new Ch.2 Sec.2 Table B3. Parts adapted from Lifting Appliances.
General 'cleaning' in Ch.2 Sec.5, including clarification of emergency power requirements to dynamically positioned drilling units.

[Table of Contents] Ch.1: Introduction