The electronic pdf versions of the documents found through http://www.dnv.com/ are the officially binding versions. Copyright Det Norske Veritas.
|
|
DNV-OS-E302 Offshore Mooring Chain |
|
| Ch.3: Certification and Classification |
Ch.3
Ch.3 Sec.1 A
| Table A1 DNV Offshore Service Specifications | |
| No. | Title |
| DNV-OSS-101 | Rules for Classification of Offshore Drilling and Support Units |
| DNV-OSS-102 | Rules for Classification of Floating Production, Storage and loading Units |
| — | design verification |
| — | approval of manufacturers |
| — | survey during manufacture. |
Guidance note: ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Design requirements are given in DNV-OS-E301.
| — | complexity and size of a delivery |
| — | previous experience with equipment type |
| — | maturity and effectiveness of manufacturer's quality system |
| — | degree of subcontracting. |
| — | purchaser's name, order number and vessel identification, where known |
| — | manufacturer's name |
| — | number and dimensions of bars and steel grade |
| — | identification marking of bars |
| — | heat number and chemical composition |
| — | results of mechanical tests |
| — | details of heat treatment of test material |
| — | results of any supplementary and additional test requirements specified. |
| — | purchaser's name, order number and vessel identification, where known |
| — | manufacturer's name |
| — | number and dimensions of semi-finished products and steel grade |
| — | identification marking of products |
| — | heat number and chemical composition |
| — | details of heat treatment |
| — | results of any supplementary and additional test requirements specified. |
| — | purchaser's name, order number and vessel identification, where known |
| — | manufacturer's name |
| — | description of products and dimensions |
| — | grade of chain, method of manufacture, condition of supply and reference to material certificate |
| — | identification marking |
| — | results of proof load test, breaking load test and mechanical tests |
| — | confirmation of dimensional measurements and inspections. |
Ch.3
Ch.3 App.A (0)
| Activity or item | Ref in OS | Survey | Description |
| Pre-production meeting | NA | H | - Scope of delivery - Schedule - Inspection and test plan - Works approval status - Design approval status - Procedures approval status - Test machines calibration status |
| Materials | Ch.2 Sec.1 | M/R | - Certificates and traceability |
| Manufacture | Ch.2 Sec.2 B300 | M/R | - Procedure compliance - Records |
| Welding of studs | Ch.2 Sec.2 B400 | M/R | - Procedure compliance - Records |
| Heat treatment | Ch.2 Sec.2 B500 | M/R | - Procedure compliance - Records |
| Proof load testing | Ch.2 Sec.2 B600 | W/R | - Witness in beginning, then monitoring - Procedure compliance - Records |
| Breaking load testing | Ch.2 Sec.2 B700 | H/R | - Witness - Procedure compliance - Records |
| Mechanical testing | Ch.2 Sec.2 B800 | H/R | - Witness - Procedure compliance - Records |
| Dimensional measurements | Ch.2 Sec.2 B900 | M/R | - Procedure compliance - Records |
| Inspection | Ch.2 Sec.2 B1000 | M/R | - Procedure compliance - Records |
| Repair | Ch.2 Sec.2 B1100 | H/M/R | - Witness splice link set-up and testing - Procedure compliance - Records |
| Identification | Ch.2 Sec.2 B1200 | M/R | |
| Records (Data book) | Ch.2 Sec.2 A500 | H/R |
Definitions
| Hold point (H) | A point where DNV shall be present for supervision or survey. Advance notification to DNV shall be given in writing or any other agreed system of notification. Work shall not proceed beyond a hold point without DNV present or, in exceptional cases where presence is waived, without first obtaining written authorisation from DNV. |
| Witness point (W) | A point where DNV may be present for supervision or survey, at their discretion. Advance notification to DNV shall be given in writing or any other agreed system of notification. Work may proceed beyond a witness point with or without DNV present. |
| Monitoring (M) | Intermittent monitoring or surveillance of any stage of the work in progress including, but not limited to, checking compliance with procedures/instructions for manufacture, testing and inspection, observing workmanship, traceability, etc. |
| Review (R) | Examination of records of activities performed or results achieved. |
Ch.3
Ch.3 App.B (0)
| Activity or item | Ref in OS | Survey | Description |
| Pre-production meeting | NA | H | - Scope of delivery - Schedule - Inspection and test plan - Works approval status - Design approval status - Procedures approval status - Test machines calibration status |
| Materials | Ch.2 Sec.1 | M/R | - Certificates and traceability |
| Manufacture | Ch.2 Sec.1 | M/R | - Procedure compliance - Records |
| Heat treatment | Ch.2 Sec.1 | M/R | - Procedure compliance - Records |
| Proof load testing | Ch.2 Sec.2 C300 | W/R | - Witness in beginning, then monitoring - Procedure compliance - Records |
| Breaking load testing | Ch.2 Sec.2 C400 | H/R | - Witness - Procedure compliance - Records |
| Mechanical testing | Ch.2 Sec.2 C500 | H/R | - Witness - Procedure compliance - Records |
| Dimensional measurements | Ch.2 Sec.2 C600 | M/R | - Procedure compliance - Records |
| Inspection | Ch.2 Sec.2 C700 | M/R | - Procedure compliance - Records |
| Repair | Ch.2 Sec.2 C800 | M/R | - Procedure compliance - Records |
| Identification | Ch.2 Sec.2 C900 | M/R | |
| Records (Data book) | Ch.2 Sec.2 A500 | H/R |
Definitions
| Hold point (H) | A point where DNV shall be present for supervision or survey. Advance notification to DNV shall be given in writing or any other agreed system of notification. Work shall not proceed beyond a hold point without DNV present or, in exceptional cases where presence is waived, without first obtaining written authorisation from DNV. |
| Witness point (W) | A point where DNV may be present for supervision or survey, at their discretion. Advance notification to DNV shall be given in writing or any other agreed system of notification. Work may proceed beyond a witness point with or without DNV present. |
| Monitoring (M) | Intermittent monitoring or surveillance of any stage of the work in progress including, but not limited to, checking compliance with procedures/instructions for manufacture, testing and inspection, observing workmanship, traceability, etc. |
| Review (R) | Examination of records of activities performed or results achieved. |
|
|