The electronic pdf versions of the documents found through http://www.dnv.com/ are the officially binding versions. Copyright Det Norske Veritas.
|
DNV-OS-E303 Offshore Mooring Fibre Ropes
|
CHAPTER 3
Classification and Certification
Ch.3
SECTION 1
Classification and CertificationCh.3 Sec.1
A. Certification
Ch.3 Sec.1
A 100 General
Ch.3 Sec.1 A
101 The principles, procedures, applicable class notations and
technical basis for offshore classification are given
in DNV-OSS-101 for Offshore Drilling and Support Units and DNV-OSS-102
for Floating Production and Storage Units.
Ch.3 Sec.1 A
102 The following requirements shall be applied in conjunction
with certification according to this standard.Ch.3 Sec.1
A 200 Main elements in certification
Ch.3 Sec.1 A
201 The main elements in certification of fibre-rope assemblies
are approval of Manufacturer, design verification and fabrication
survey.Ch.3 Sec.1
A 300 Approval of Manufacturer
Ch.3 Sec.1 A
301 Load bearing yarn, fibre rope segments and termination hardware
shall be manufactured at works which have been approved by DNV.Guidance note:
Approved manufacturers are published on DNV Exchange on the
Internet. (http://exchange.dnv.com/tari)---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Ch.3 Sec.1 A
302 In order to be approved, the manufacturer shall demonstrate
and submit documentation to the effect that the necessary manufacturing,
testing and inspection facilities and procedures are available and
are supervised by qualified personnel. The manufacturer shall also
carry out a test programme and submit the results.
Ch.3 Sec.1 A
303 Detailed programmes for approval are given in Standards for
Certification No.2.9.Ch.3 Sec.1
A 400 Deviations and test waivers
Ch.3 Sec.1 A
401 If a manufacturer or user wishes to deviate from the requirements
of this Offshore Standard, or any reference standard, then thoroughly
documented request for waiver of test or deviation shall be submitted
for approval by DNV. Any such request should be included in the
Request for Certification.
Ch.3 Sec.1 A
402 Any deviations, exceptions and modifications to referenced
codes and standards shall be documented and agreed between user,
manufacturer and DNV.Ch.3 Sec.1
A 500 Design Verification
Ch.3 Sec.1 A
501 Design verification covers review of specifications and documentation
listed in Ch.2 Sec.2 and issuance of
Design Verification Report.Ch.3 Sec.1
A 600 Survey during manufacture
Ch.3 Sec.1 A
601 Fabrication survey shall be based on attending tests and inspections,
monitoring manufacturing, and review of records.
Ch.3 Sec.1 A
602 Follow-up and witness of the production shall be based on
the Manufacturing description and the Inspection & Test
plan. Ch.3 Sec.1
B. Certification of yarns
Ch.3 Sec.1
B 100 Load-bearing yarns
Ch.3 Sec.1 B
101 Load-bearing yarns for use in fibre ropes shall be certified
by DNV. One certificate will be issued for each delivery.
Ch.3 Sec.1 B
102 Certification of yarn consists of monitoring and witnessing
of testing according to an inspection and test plan (ITP).
Ch.3 Sec.1 B
103 Lots for making the yarn shall be delivered with the manufacturers
own certificate or a works certificate.
Ch.3 Sec.1 B
104 The following particulars will be listed in the certificate:
| — | purchasers name, order number |
| — | manufacturers name |
| — | description of products |
| — | grade of yarn, delivery condition (coating etc) |
| — | identification marking |
| — | test results. |
The types of testing for production deliveries are given in Ch.2 Sec.3. The extent of survey
and testing should be taken as given by the Approval of Manufacturer
documentation.
Ch.3 Sec.1
B 200 Non-load bearing components
Ch.3 Sec.1 B
201 Sheathing materials to be ordered with 2.2 certificates.
Ch.3 Sec.1 B
202 In case of a custom-designed jacket for increased cut resistance,
materials shall be ordered with 3.2 certificates.Ch.3 Sec.1
C. Certification of termination
hardware
Ch.3 Sec.1
C 100 General
Ch.3 Sec.1 C
101 Thimbles shall be certified by DNV, based on the requirements
of this standard. Minimum one certificate will be issued per delivery.
Ch.3 Sec.1 C
102 Other termination elements shall be certified by DNV according
to the appropriate standard.Ch.3 Sec.1
D. Certification of Fibre-Rope
Assemblies
Ch.3 Sec.1
D 100 Introduction
Ch.3 Sec.1 D
101 This section describes the work process that shall take place
when fibre-rope assemblies are certified according to the requirements
of this standard. It is attempted to give this chapter a chronological
order such that the prerequisites for certain steps or milestones
may be readily determined. The requirements are found in Chapter
2.
Ch.3 Sec.1 D
102 Fibre-rope assemblies shall be certified by DNV. Certification
consists of survey according to ITP. The scope of survey shall as
a minimum include intervention points as listed in Appendix A.
Ch.3 Sec.1 D
103 For long-term moorings one DNV certificate will normally be
issued for the entire delivery. For mobile moorings it may be desirable
to issue one certificate per fibre rope assembly.
Ch.3 Sec.1 D
104 Following particulars will be listed in the certificate:| — | purchasers name, order number
and vessel identification, were known |
| — | manufacturers name |
| — | description of products and dimensions (length and diameter) |
| — | construction |
| — | identification marking |
| — | reference to yarn certificate |
| — | reference to thimble certificate(s) |
| — | MBS |
| — | A reference to repair procedure (applicable only for
mobile mooring). |
Ch.3 Sec.1
D 200 Special service requirements
Ch.3 Sec.1 D
201 In case of special service requirements such as sea-bed contact
during installation, additional qualification activities shall be
carried out based on DNV-OSS-401, subject to approval by DNV.Ch.3 Sec.1
D 300 Recertification of Offshore
Mooring Fibre Ropes
Ch.3 Sec.1 D
301 Used fibre-rope assemblies may be re-certified for continued
or prolonged service according to the provisions of this standard.
Ch.3 Sec.1 D
302 Cases which may warrant fibre-rope assembly recertification
can be:| — | rope design life has expired
and the service period of the installation shall be extended |
| — | the mooring system has seen excessive loads compared
to the design premise |
| — | the fibre-rope assembly has not been previously certified
by DNV |
| — | the rope has been damaged and needs repair. |
Ch.3 Sec.1 D
303 The requirements for recertification will be determined by
DNV's responsible approval centre on a case-by-case basis. Guidance note:
If a rope is recertified either in connection with repair
or after expiry of previous certificate a new certificate will be issued.
The new certificate will refer to the previous certificate number.
The certificate will be issued by the surveyor witnessing the testing
and repair. The certificate will state the history of the rope to
the extent possible. ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Ch.3
SECTION 2
Work Process for Certification of Fibre-rope AssembliesCh.3 Sec.2
A. General
Ch.3 Sec.2
A 100 Introduction
Ch.3 Sec.2 A
101 In the following, the work process is described. The process
consists of the following main steps in chronological order:
| — | request for certification |
| — | pre-production meeting |
| — | submittal of documentation for approval |
| — | design verification |
| — | production and survey |
| — | issuance of certification documents. |
Ch.3 Sec.2
A 200 Request for certification
Ch.3 Sec.2 A
201 The request for certification should be sent to DNV by e-mail.
The following information should be included:General:
| — | manufacturer name, plant location
and reference to manufacturer-approval certificate |
| — | production and delivery schedules for fibre-rope segments
and termination hardware |
| — | testing facilities, location and foreseen testing schedule |
| — | type of mooring: mobile or long-term |
| — | scope of delivery |
| — | any requests for deviations or test waivers, fully documented |
| — | dimension, breaking strength of the fibre-rope assembly,
including type of fibre and rope construction. |
Additional information for long
term mooring systems:
| — | in-service condition assessment
scheme |
| — | key results from mooring analysis in order to decide
the load levels to be used in the certification test program and
determine the rope length in production. |
Ch.3 Sec.2
A 300 Pre-production Meeting
Ch.3 Sec.2 A
301 A pre-production meeting shall be held at the manufacturer's
premises prior to start of the certification process.
Ch.3 Sec.2 A
302 The meeting shall include representatives from the following
organisations:| — | manufacturer of the fibre ropes |
| — | DNV surveyor from local survey station appointed to
follow up production and testing |
| — | representative from DNV's responsible approval
centre in case of special service requirements requiring additional
qualification activities |
| — | representative from testing facility if the tests are
not carried out by the manufacturer or by DNV. |
Ch.3 Sec.2 A
303 The presentation made by the manufacturer shall include:| — | scope of work |
| — | outline and description of the components to be produced |
| — | content and requirements of purchase orders/specifications |
| — | testing facilities |
| — | any requests for deviations or test waivers |
| — | any elements not directly covered by this standard |
| — | manufacturer's description/specification
regarding production, terminations and testing. |
Ch.3 Sec.2 A
304 The presentation made by DNV will include:| — | presentation of DNV-OS-E303
(this standard) |
| — | outline and explanation of specific requirements regarding
class and certification |
| — | scope of design verification and survey to be carried
out by DNV:| — | status of documentation submitted to DNV | | — | status approval of rope manufacturer and sub suppliers | | — | survey during fabrication of fibre-rope segments and
termination hardware | | — | certification of the termination hardware (type of certificate
it shall be ordered with, and requirements to materials and testing) | | — | witnessing during testing. |
|
| — | final documentation requirements:| — | content | | — | issue and distribution | | — | review of final documentation. |
|
Ch.3 Sec.2 A
305 Minutes of Meeting from the pre-production meeting should
be issued by the QA responsible of the manufacturer and distributed
to the involved parties.Ch.3 Sec.2
B. Design Verification
Ch.3 Sec.2
B 100 General
Ch.3 Sec.2 B
101 The design verification will be carried out based on the required
documentation which shall be submitted by this stage in the work
process.
Ch.3 Sec.2 B
102 The documentation requirements and the responsibilities of
the user and the manufacturer are summarised in Chapter 2. Approved
design documentation and procedures will be listed in the Design Verification
Report (DVR).Ch.3 Sec.2
C. Design Verification Report
Ch.3 Sec.2
C 100 General
Ch.3 Sec.2 C
101 DNV will issue a Design Verification report (DVR) for the
fibre-rope assemblies. The DVR will state:| — | documents which have been reviewed |
| — | complying standards |
| — | assumptions |
| — | conditions and limitations |
| — | a list of all documents from the client/manufacturer
will be included together with reference correspondence; any comments
which are to be taken into account. |
Ch.3 Sec.2
D. Start up of production
Ch.3 Sec.2
D 100 General
Ch.3 Sec.2 D
101 The production of the fibre-rope segments can commence when
DNV's responsible approval centre has issued the Design
Verification Report.Ch.3 Sec.2
E. Survey during production and
testing
Ch.3 Sec.2
E 100 Scope of survey
Ch.3 Sec.2 E
101 Check certificates for load-bearing yarns.
Ch.3 Sec.2 E
102 Check certificates for yarns and fabrics to be applied in
the sheathing process.
Ch.3 Sec.2 E
103 Prior to start of testing, the attending surveyor and the
responsible test engineer should review the approved testing specification
together.
Ch.3 Sec.2 E
104 Number of rope tests to be witnessed has to be decided by
the surveyor based on experience with the product and the testing
laboratory. For testing carried out by DNV, the survey is performed
by the responsible test engineer.
Ch.3 Sec.2 E
105 Witness that the production is carried out in accordance with
the manufacturing specification and associated QA plans regarding
the production of subropes, fibre ropes, terminations and sheathing.
Ch.3 Sec.2 E
106 Scope of survey at the rope manufacturer can be found in Appendix
A of this standard.Ch.3 Sec.2
F. Testing
Ch.3 Sec.2
F 100 General
Ch.3 Sec.2 F
101 The testing shall be carried out according to the provisions
set forth in the testing specification.
Ch.3 Sec.2 F
102 The testing specification for all tests and reporting is subject
to approval by DNV.
Ch.3 Sec.2 F
103 Subject to documentation and approval by DNV, fibre-rope assembly
specimen(s) may be used for change-in-length testing for mobile
moorings, instead of the three subropes. Guidance note:
This depends on the measurement accuracy which is required
by the user for the mooring analysis. ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Ch.3 Sec.2 F
104 If cyclic endurance testing and subsequent examinations according
to approved procedure of an equal-size or larger, but otherwise
identical, fibre-rope assembly has been carried out before, then
the test can be waved - subject to a documented waiver
request and approval by DNV.Guidance note:
The same specimen can be used for measuring different properties.
The force vs. change-in-length performance of the mooring
line is paramount to the system design. Thus, design-specific specification
should be made for each mooring system. Notwithstanding this, universal
test results for stiffness and change in length can be accepted.
Examples on change-in-length
tests can be found in API RP 2SM, ISO 18692 or in CI 1500.
Examples of torque-measurement
testing and soil-ingress resistance testing can be found in ISO
18692. ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Ch.3 Sec.2
G. Certificates
Ch.3 Sec.2
G 100 Certificates for Load-Bearing
Yarns
Ch.3 Sec.2 G
101 The load-bearing yarn for the fibre-ropes shall be ordered
with DNV certification at the works. Ch.3 Sec.2
G 200 Certificates for Termination
Hardware
Ch.3 Sec.2 G
201 Termination hardware shall be ordered with DNV certification
at the works.
Ch.3 Sec.2 G
202 The certificate format and contents for compliance with this
standard is shown in Appendix D.Ch.3 Sec.2
G 300 Certificates for Fibre-Rope
Assemblies
Ch.3 Sec.2 G
301 The certificate format and contents for compliance with this
standard is shown in Appendix B for
Long-Term-Mooring and in Appendix
C for Mobile-Mooring. Ch.3
APPENDIX A
Scope of Survey at Rope Manufacturer
Surveyor shall have access to the manufacture at any time
of production.
An ITP shall be issued by the manufacturer. The ITP shall
be reviewed and approved by the surveyor prior to start of production.
The DNV intervention points shall as a minimum include following:
Ch.3 App.A (0)
| Activity | Ref. in OS | DNV role | Description |
| Pre-production meeting | Ch.3 Sec.2 | H | Scope of deliverySchedule/ITPRope
manufacturer AoM statusYarn type, AoM statusTermination hardware
AoM statusTesting facilitiesDesign documentation status |
| Materials | Ch.2 Sec.2 | M/R | Procurement of materials (yarns, filters, sheating)-recipe
of goods:Check certificates and traceability for load bearing yarnsCheck
certificates and traceability of termination hardwareCertificates
and traceability of non-load bearing yarns, filters, etc. |
| Manufacturing of subropes | | H(W)/M | Witness start of production then monitoring-procedure
complianceWitness that the production is carried out in accordance
with the manufacturing specification and associated QA plans regarding
the production of subropes.Hold point on first subrope if next rope
is manufactured with same setup. Witness point on remaining subropes. |
| Braiding of rope | | H(W)/M | Witness start of production. Set up of register
plates, set up of machines. Then monitoringProcedure complianceWitness
that the production is carried out in accordance with the manufacturing
specification and associated QA plans regarding the production of
ropes.Hold point on first rope if next rope is manufactured with
same setup. Witness point on remaining ropes. |
| Eye splicing/Coating | | H/W | Hold point on first splice. For each step in
the production process for the soft eye the surveyor will witness
compliance to manufacturing description and rope design description,For
remaining terminations witnessing will be carried out.Procedure
compliance. Including application of PU coating. |
| Testing of subropes
and fibre rope assembly | Ch.2 Sec.4 | H | Survey of all tests on the subropes and the
full ropes. Prior to start of testing, the attending surveyor and
the responsible test engineer should review the approved testing
specification together.Visual inspection of the finished fibre rope
assembly with hardware fitted, marking, splices, how thimbles are
sitting and ease of assembly. Testing shall be in accordance with
approved testing specification |
| Final inspection | | H | Visual inspection of the finished fibre rope. Inspection
on transportation/packing of the rope, shall be within specification
for handling and installation. Marking and packing in accordance
to approved procedure.Check identification marking of ropes, thimbles
etc. Visual inspection of the rope, no cuts and abrasion, eyes thimbles,
chafe protection. |
| Records (Data book) | | R | Production and test reportsComplete design
documentation |
| Issuance of certificate | | H | |
Definitions:
Hold point (H): A point
where DNV shall be present for survey. Advance notification to DNV
shall be given in writing or any other agreed system of notification.
Work shall not proceed beyond a hold point without DNV present or,
in exceptional cases where presence is waved, without first obtaining
a written authorisation from DNV.
Witness point (W): A
point where DNV may be present for survey, at their discretion.
Advance notification to DNV shall be given in writing or any other
agreed system of notification. Work may proceed beyond a witness point
with or without DNV present.
Monitoring (M): Intermittent
survey of any stage of the work in progress including, but not limited
to, checking compliance with procedures/instructions for
manufacture, testing and inspection, observing workmanship, traceability,
etc.
Review (R): Examination
of records of activities performed or results achieved.
Ch.3
APPENDIX B
Example of Certificate Format for Long-Term Moorings
Ch.3
APPENDIX C
Example of Certificate Format for Mobile Moorings
Ch.3
APPENDIX D
Example of Certificate Format for Termination Hardware