The electronic pdf versions of the documents found through http://www.dnv.com/ are the officially binding versions. Copyright Det Norske Veritas.
|
|
DNV-OSS-101 Rules for Classification of Offshore Drilling and Support Units |
|
| Ch.2: Design and Construction Provisions |
|
| Sec.1: Design and Construction Requirements for 1A1 MOU Main Class |
|
| A: General |
|
| B: Safety Principles and Arrangement |
|
| C: Materials |
|
| D: Structural Design |
|
| E: Fabrication and Testing of Offshore Structures |
|
| F: Stability and Watertight/Weathertight Integrity |
|
| G: Mooring and Towing |
|
| H: Marine and Machinery Systems and Equipment |
|
| I: Electrical Systems and Equipment |
|
| J: Instrumentation and Telecommunication Systems |
|
| K: Fire Protection |
|
| L: Summary of Technical Reference Standards |
|
| Sec.2: Supplementary Requirements for Service Notation Drilling Unit |
|
| A: General |
|
| B: Safety Principles and Arrangement |
|
| C: Structural Design |
| D: Not in Use |
|
| E: Fire Protection |
|
| F: Summary of Requirements |
|
| G: Preparation for Surveys and Inspections on Location |
|
| Sec.3: Supplementary Requirements for Service Notation Well Intervention Unit 1 and Well Intervention Unit 2 |
|
| A: General |
|
| B: Requirements for Well Intervention Unit 1 |
|
| C: Requirements for Well Intervention Unit 2 |
|
| D: Structural Design |
|
| E: Position Keeping |
|
| Sec.4: Supplementary Requirements for Service Notation Accommodation Unit |
|
| A: General |
|
| B: Safety Principles and Arrangement |
|
| C: Structural Strength |
|
| D: Stability and Watertight Integrity |
|
| E: Electrical Systems and Equipment |
|
| F: Position Keeping |
|
| Sec.5: Supplementary Requirements for Service Notation Crane Unit |
|
| A: Introduction |
|
| B: Structural Design |
|
| C: Stability and Watertight Integrity |
|
| D: Certification of Materials and Components |
|
| Sec.6: Additional Class Notations: Design and Construction Requirements for Special Equipment and Systems |
|
| A: Introduction |
|
| B: Position Mooring System |
|
| C: Dynamic Positioning Systems |
|
| D: Drilling Plant |
|
| E: Helicopter Decks |
|
| F: Well Testing Facilities |
|
| G: Temporary Oil Storage Facilities |
|
| H: Crane Installations |
|
| I: Diving System Installations |
|
| J: Additional Fire Protection |
|
| K: Fire Fighters |
|
| L: Loading computer |
|
| M: Periodically Unattended Machinery Space |
|
| N: Well Intervention System |
|
| O: Hull Monitoring System |
|
| P: Noise, Vibration and Comfort Rating Notations |
|
| Q: Winterization, Cold Climate and Ice Notations |
|
| R: Management of Safety and Environmental Protection |
|
| S: Environmental Notations |
|
| T: Integrated Software Dependent Systems |
|
| U: Special Feature Notations |
|
| V: Summary of Reference Documents for Additional Class Notations |
|
| Sec.7: Service Notation Wind Turbine Installation Unit |
|
| A: General |
|
| B: General requirements for Wind Turbine Installation Unit |
|
| C: Crane Installations |
|
|