DNV-OSS-121 Classification Based on Performance Criteria Determined from Risk Assessment Methodology
|
SECTION 4
Verification, Maintenance of
ClassSec.4
A. General
Sec.4
A 100 Introduction
Sec.4 A
101 In order to maintain valid classification in-service, DNV will
verify the suitability of the safety-critical elements. This includes
verification by examination, testing, audit and review, as necessary
to give assurance that all safety-critical elements are selected
and that they will remain in good repair and condition suitable
for the intended purpose.Sec.4
B. In-Service Verification Scheme
for
Maintenance of Class
Sec.4
B 100 General
Sec.4 B
101 DNV will establish a verification scheme for the ongoing review,
approval and surveying of safety-critical elements for an installation
in service.
The scheme will include:
| — | review of the selected safety-critical
elements and performance standards, particularly with respect to:| — | changes in operational requirements | | — | modifications planned or performed | | — | knowledge accumulated during operation of the scheme. |
|
| — | continuing and updated work plan and schedule for the verification
work |
| — | documented results of verification work including any identified
remedial actions or other need for change. |
Sec.4
B 200 Review of safety-critical elements
Sec.4 B
201 The review of safety-critical elements will continue on from
the initial verification during design and construction, and will
take account of:| — | changes in operational requirements |
| — | modifications planned or performed |
| — | accumulated knowledge during operation of the scheme. |
Sec.4
B 300 Verification scheme
Sec.4 B
301 The verification scheme will indicate all activities to be performed
for each safety-critical element. The scheme will take credit for
activities performed under the operator's inspection and
maintenance plan.The extent of verification work will be determined based on
a review of the operator's own maintenance arrangements,
including review of:
| — | maintenance and inspection objectives
and management |
| — | competency of personnel |
| — | planning, scheduling and reporting tasks |
| — | inspection intervals |
| — | inspection and maintenance methods |
| — | type, accuracy and condition of equipment used |
| — | systems for planning and recording. |
Once the level of maintenance and testing has been reviewed, the
content of the verification scheme will be tailored as necessary
to provide assurance that safety-critical elements meet the performance
standards. Activities under the scheme will consist of an appropriate
combination of:
| — | physical examination |
| — | testing of systems and or components |
| — | audit of activities and procedures |
| — | review of inspection records. |
Sec.4 B
302 The content of the operator's maintenance and inspection
plan is a key element in the verification scheme. Therefore, any
revision to the maintenance and inspection plan shall be notified
to DNV for review and approval. DNV will update or revise the verification
scheme as necessary to reflect such changes to the maintenance and
inspection plan.
Sec.4 B
303 Verification activities shall be undertaken as and when appropriate
according to the verification scheme. This may be on a continuous
basis dependent upon the actual safety-critical elements, and the
operator's own maintenance and inspection plan.
Sec.4 B
304 Based on indications and results, the verification scheme may
be modified to include greater or lesser level of activities as
necessary to ensure the ongoing performance of safety-critical elements.
Sec.4 B
305 Results and status of verification tasks will be documented
within the scheme itself and through annual verification reports.
The reports may in turn be used as documentation for other obligatory
or regulatory requirements.
Sec.4 B
306 The operator is expected to co-operate with the application
of the verification scheme, through timely provision of adequate
information and access to all facilities as necessary to fulfil
the verification tasks.
Sec.4 B
307 Necessary remedial measures with associated conditions of
class and time scales will be notified to the operator or owner
and recorded within the verification scheme.
Sec.4 B
308 Failure to effect remedial measures within the given time
scales or obstruction of execution of the verification scheme may
result in suspension or withdrawal of class.