DNV-OSS-121 Classification Based on Performance Criteria Determined from Risk Assessment Methodology

[-] Sec.4: Verification, Maintenance of Class

SECTION 4
Verification, Maintenance of Class

Sec.4
A. General

Sec.4
A 100   Introduction

Sec.4 A
101
   In order to maintain valid classification in-service, DNV will verify the suitability of the safety-critical elements. This includes verification by examination, testing, audit and review, as necessary to give assurance that all safety-critical elements are selected and that they will remain in good repair and condition suitable for the intended purpose.

Sec.4
B. In-Service Verification Scheme for
Maintenance of Class

Sec.4
B 100   General

Sec.4 B
101
   DNV will establish a verification scheme for the ongoing review, approval and surveying of safety-critical elements for an installation in service.

The scheme will include:
review of the selected safety-critical elements and performance standards, particularly with respect to:
changes in operational requirements
modifications planned or performed
knowledge accumulated during operation of the scheme.
continuing and updated work plan and schedule for the verification work
documented results of verification work including any identified remedial actions or other need for change.

Sec.4
B 200   Review of safety-critical elements

Sec.4 B
201
   The review of safety-critical elements will continue on from the initial verification during design and construction, and will take account of:
changes in operational requirements
modifications planned or performed
accumulated knowledge during operation of the scheme.

Sec.4
B 300   Verification scheme

Sec.4 B
301
   The verification scheme will indicate all activities to be performed for each safety-critical element. The scheme will take credit for activities performed under the operator's inspection and maintenance plan.

The extent of verification work will be determined based on a review of the operator's own maintenance arrangements, including review of:
maintenance and inspection objectives and management
competency of personnel
planning, scheduling and reporting tasks
inspection intervals
inspection and maintenance methods
type, accuracy and condition of equipment used
systems for planning and recording.

Once the level of maintenance and testing has been reviewed, the content of the verification scheme will be tailored as necessary to provide assurance that safety-critical elements meet the performance standards. Activities under the scheme will consist of an appropriate combination of:
physical examination
testing of systems and or components
audit of activities and procedures
review of inspection records.


Sec.4 B
302
   The content of the operator's maintenance and inspection plan is a key element in the verification scheme. Therefore, any revision to the maintenance and inspection plan shall be notified to DNV for review and approval. DNV will update or revise the verification scheme as necessary to reflect such changes to the maintenance and inspection plan.

Sec.4 B
303
   Verification activities shall be undertaken as and when appropriate according to the verification scheme. This may be on a continuous basis dependent upon the actual safety-critical elements, and the operator's own maintenance and inspection plan.

Sec.4 B
304
   Based on indications and results, the verification scheme may be modified to include greater or lesser level of activities as necessary to ensure the ongoing performance of safety-critical elements.

Sec.4 B
305
   Results and status of verification tasks will be documented within the scheme itself and through annual verification reports. The reports may in turn be used as documentation for other obligatory or regulatory requirements.

Sec.4 B
306
   The operator is expected to co-operate with the application of the verification scheme, through timely provision of adequate information and access to all facilities as necessary to fulfil the verification tasks.

Sec.4 B
307
   Necessary remedial measures with associated conditions of class and time scales will be notified to the operator or owner and recorded within the verification scheme.

Sec.4 B
308
   Failure to effect remedial measures within the given time scales or obstruction of execution of the verification scheme may result in suspension or withdrawal of class.


Sec.3: Verification, Class Entry [Table of Contents]