| Table 3-3
Scope of work for certification of manufacturing and fabrication
of linepipe and other PRESSURE CONTAINING components |
| Verification activity | Level |
| L | M | H |
| Review of the manufacturing & fabrication
process by | | | |
| — | review
of manufacturing and fabrication management systems | | x | x | x |
| — | audit of
the quality management system | | | x | x |
| Review of manufacturing & fabrication
procedures by | | | |
| — | review
manufacturing, fabrication and inspection procedures for confirmation
of compliance with the manufacturing specification | | x | x | x |
| — | review
method statements | | | x | x |
| Review of qualification
process by | | | |
| — | review
the Manufacturing Procedure Specification, (MPS), Manufacturing
Procedure Qualification Test (MPQT), if applicable | | x | x | x |
| — | full time
attendance during MPQT, if applicable, or first day production | | | x | x |
| Surveillance during
manufacturing and fabrication activities by | | | |
| — | visit-based
attendance during testing, to ensure, based on spot checks, that
the delivered products have been produced in accordance with the
manufacturing specification | | x | x | x |
| — | visit-based
or full-time attendance during manufacturing and fabrication to
ensure, based on spot checks, that the delivered products have been
produced in accordance with the manufacturing specification | | | x | x |
| — | full-time
attendance during manufacturing and fabrication to ensure, based
on spot checks, that the delivered products have been produced in
accordance with the manufacturing specification | | | | x |
| — | FOR LINEPIPE
PRODUCTION ONLY: overall independent verification of production
must be sufficient for DNV to operate its independent quality system
(QVS) to get an independent verification of the delivered pipes | | | | x |
| Review of final
documentation | x | x | x |
| Table 3-4 Scope of
work for certification of manufacturing and fabrication of coatings,
anodes and other NON-PRESSURE CONTIANING components |
| Verification activity | Level |
| L | M | H |
| Review of the manufacturing & fabrication
process by | | | |
| — | review
of manufacturing and fabrication management systems | | x | x | x |
| — | audit of
the quality management system | | | | x |
| Review of manufacturing & fabrication
procedures by | | | |
| — | review
manufacturing, fabrication and inspection procedures for confirmation
of compliance with the manufacturing specification | | | x | x |
| Review of qualification
process by | | | |
| — | review
the Manufacturing Procedure Specification, (MPS), Manufacturing
Procedure Qualification Test (MPQT), if applicable | | x | x | x |
| — | full time
attendance during MPQT, if applicable, or first day production | | | | x |
| Surveillance during
manufacturing and fabrication activities by | | | |
| — | visit-based
attendance during testing, to ensure, based on spot checks, that
the delivered products have been produced in accordance with the
manufacturing specification | | | x | x |
| — | visit-based
attendance during manufacturing and fabrication to ensure, based
on spot checks, that the delivered products have been produced in
accordance with the manufacturing specification | | | | x |
| Review of final
documentation | x | x | x |
| Table 3-5 Scope of
work for certification of installation |
| Verification activity | Level |
| L | M | H |
| Review of the installation
process by | | | |
| — | review
of installation management systems | | x | x | x |
| — | audit of
the quality management system | | | x | x |
| Review of installation
procedures by | | | |
| — | spot check
of Installation Manual, (IM) | | x | x | x |
| — | for critical
operations (identified from the FMEA and HAZOP studies) review the
IM | | | x | x |
| Review of qualification
process by | | | |
| — | for critical
operations, review the qualification of the IM | | x | x | x |
| — | full time
attendance during qualification tests, if applicable, or production
start-up | | | x | x |
| Surveillance during
installation activities by | | | |
| — | visit-based
attendance during start up of each offshore operation (i.e. pipelaying,
riser installation, intervention works, etc. | | x | x | x |
| — | full time
attendance during tension trials and associated lay tests: visit-
based attendance during laying | | | x | x |
| — | full time
attendance at each offshore operation (i.e. pipelaying, riser installation,
intervention works | | | | x |
| Review of final
documentation | x | x | x |
| Table 3-6 Scope of
work for certification of final testing for operation, including
as-built survey and project completion |
| Verification activity | Level |
| L | M | H |
| Review of the process
by | | | |
| — | review
of management systems | | x | x | x |
| — | audit of
the quality management system | | | | x |
| Review of procedures
by | | | |
| — | review
of the procedures for system pressure test to ensure that the test
procedure will test the pipeline system in accordance with the design
requirements | | x | x | x |
| Surveillance during
testing and completion activities by | | | |
| — | full time
attendance during pressure testing (minimum 24 hrs) | | x | x | x |
| — | full time
attendance during testing and audit based attendance during cleaning,
gauging, de-watering and drying. Visit-based attendance during as-built
surveying | | | | x |
| Review of final
documentation by | | | |
| — | spot check
of as-built documentation | | x | x | x |
| — | review
of as-built documentation | | | | x |