DNV-OSS-306 Verification of Subsea Facilities |
|
| Sec.2: Service Overview |
| — | an overview of life cycle verification activities relating to the system |
| — | details of DNV's verification services for subsea facilities. |
Project initiation:
| — | Conceptual design |
Project realisation:
| — | Detail design |
| — | Construction |
| — | Manufacturing of subsea facilities |
| — | Manufacturing and fabrication of subsea facilities components and assemblies |
| — | Installation |
| — | Project completion (pre-commissioning) |
| — | Commissioning |
| — | Issue of as-built/as-installed documentation, including Design Fabrication and Installation (DFI) resume |
Project operation:
| — | Issue of Operation Manuals |
| — | Operations, maintenance and repair |
Project abandonment
| — | Decommissioning |
| — | Removal |
| — | Use trigger questions to assess the overall risk level of the project (or manageable elements thereof). |
| — | Evaluate the risk against the relevant owner or project acceptance criteria (often this can be directly tied to the owner core values or a sub-set of these) and decide whether the general verification involvement shall be Low, Medium or High. |
| — | Use the example detailed scope of work tables in Appendix B to make a first draft of a Verification Plan |
| — | Generate the project specific Verification Plan by including a project specific engineering judgment or risk analysis to adjust the table to suit the project. |
| — | Perform the verification execution according to the Verification Plan, making revision to the plan if and when necessary. |
| — | Report the verification. |
Guidance note: ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Most standards are a coherent collection of requirements for
all the relevant aspects of a pipeline system. These aspects, e.g.
load and resistance, are normally among themselves adjusted to give an
overall acceptable safety level. To pick requirements from different
standards can then easily result in unpredictable (low) levels of
safety, and non-uniform level of safety.
| — | environmental aspects |
| — | project schedule |
| — | cost. |
Guidance note: ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
The split between design and construction may vary, but it
is useful spend some time on the definition to reduce interface
problems later.
Sec.2 D
| Table 2-1 Scope of work for verification of overall project management | ||||||||||||||||||||||||||||||||||||||||
| Verification activity | Level | L | M | H | Review of the project management process by | | | |
x | x | x |
| x | x |
| x | x |
| x | x |
| x | x | | |||||||||||||||||
| — | review of the design process, |
| — | review of specifications for design (Asset specifications), |
| — | review of design reports and drawings, |
| — | performing of independent parallel calculations, |
| — | review of specifications for construction and operation, resulting from design. |
Sec.2 D
| Table 2-2 Scope of work for verification of design | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Verification activity | Level | L | M | H | Review of specifications for design by | | | |
x | x | x | Review of design reports and drawings by | | | |
x | x | x |
| x | x |
| | x | Performing independent parallel calculations
by | | | |
x | x | x |
| x | x |
| | x | Review of specifications for construction and | operation by | | |
x | x | x |
| x | x |
| | x | Review of specific operational challenges (e.g.
flow assurance | | | |
x | x | x |
| x | x | | ||||||||||||||||||||||||||||||||||||||
Guidance note: ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Design verification activities may be split up between Basic
Design and Detailed Design, or other sub-phases, depending on type of
contract.
| — | reviewing the construction process, |
| — | reviewing construction procedures, |
| — | reviewing qualification process, |
| — | surveillance during construction activities, |
| — | reviewing final documentation. |
| — | Manufacturing Procedure Specification (MPS) |
| — | Manufacturing procedures, including test requirements and acceptance criteria, repairs, personnel qualification records etc |
| — | Material specifications |
| — | Quality plans |
| — | Welding Procedure Specifications (WPS) / Welding Procedure Qualification Record (WPQR) |
| — | NDT procedures |
| — | Manufacturing Procedure Qualification Test (MPQT) results; and |
| — | Manufacturer's / fabricator's quality system manual |
| — | Manufacturing procedures including test requirements and acceptance criteria, repairs, personnel qualification records etc |
| — | Material certificates |
| — | Production test records (visual, NDT, test samples, dimensional, heat treatment etc.) |
| — | Hydrostatic test report |
| — | Commissioning report |
| — | Relevant statistics of chemical composition, mechanical properties and dimensions for the deliveries |
| — | Relevant logs |
Sec.2 D
| Table 2-3 Scope of work for verification of manufacturing and fabrication | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Verification activity | Level | L | M | H | Review of the manufacturing
and fabrication process | | | |
x | x | x |
| (x) | x | Review of manufacturing
and fabrication procedures | | | |
x | x | x |
| x | x | Review of qualification
process | | | |
x | x | x |
| x | x | Surveillance during manufacturing
and fabrication activities | | | |
x | x | x |
| x | x |
| | x | Review of final documentation | x | x | x | | |||||||||||||||||||||||||||||
Guidance note: ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Materials may be ordered with certificates of varying degrees
of independent 3rd party
verification (e.g. 3.1C according to EN 10204). This can this be
integrated in the overall verification activities, so not to duplicate
work.
Sec.2 D
| Table 2-4 Scope of work for verification of installation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Verification activity | Level | L | M | H | Review of installation procedures | | | |
x | x | x |
| x | x | Review of qualification process | | | |
x | x | x |
| x | x | Surveillance during installation activities | | | |
x | x | x |
| x | x | Review of final
documentation | x | x | x | | ||||||||||||||||||||
Sec.2 D
| Table 2-5 Scope of work for verification of final testing for operation, including as-built survey and project completion | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Verification activity | Level | L | M | H | | Review of procedures | | | | |
x | x | x | | Surveillance during testing
and completion activities | | | | |
| x | x | |
| | x | |
x | x | x | | Review of final documentation | | | | |
x | x | x | |
| | x | | | |||||||||||||||||||||
| — | review of operations processes: |
| — | review of operations management systems, |
| — | audit of the quality management system, if necessary, |
| — | review of operations specifications and procedures: |
| — | confirmation of design assumptions, |
| — | method statements, |
| — | inspection plans, |
| — | inspection methods, |
| — | procedures for evaluation of inspection results, |
| — | attendance during operations activities: |
| — | attendance during inspections, |
| — | review of inspection records. |
| — | personnel responsible for the operation of the subsea facilities |
| — | history of the subsea facilities operation with reference to events that may have significance with respect to safety and functionality |
| — | installation condition data as required |
| — | physical and chemical characteristics of transported media including sand and sand detection measures |
| — | inspection and maintenance / intervention philosophy, schedules and records |
| — | inspection / intervention procedures and results as appropriate. |
Sec.2 E
| Table 2-6 Scope of work for verification of operations | ||||||||||||||||||
| Verification activity | Level | L | M | H | General review of the main document(s)
to check compliance with applicable design documentation. | Audit during repair and modification. x | x | x | Audit attendance during start-up of periodical
survey, modification and repair activities. For critical aspects,
as identified by the contract, audit attendance throughout the activities.
Review of contractors' documentation of the survey/modification. | | x | x | Review of the main document(s) to check
compliance with applicable codes and standards. Audit | attendance during start-up and performance of periodical survey, modification and repair activities. For critical aspects, as identified by the contract, full attendance throughout the preparations of and the activities. Issuing of independent confirmation documentation of the survey/modification. | | x | | ||
Guidance note: ---e-n-d---o-f---G-u-i-d-a-n-c-e---n-o-t-e---
Annual assessments do not necessarily involve annual inspections
as such regular inspections may not be required under a risk-based
inspection strategy. Annual assessments may be limited to review
of records confirming that the subsea facilities have been operated
within its design limits.
|
|