DNV-OSS-306 Verification of Subsea Facilities

[-] Sec.2: Service Overview

SECTION 2
Service Overview

Sec.2
A. General

Sec.2
A 100   Objectives

Sec.2 A
101
   The objectives of this section are to provide:
an overview of life cycle verification activities relating to the system
details of DNV's verification services for subsea facilities.

Sec.2
B. Service Process

Sec.2
B 100   General principles

Sec.2 B
101
   The description of the process of DNV's verification of subsea facilities is based on distinct project phases and the recognition of key milestones.

Sec.2 B
102
   Verification performed by DNV normally progresses through one or more of these project phases and may include all or selected aspects of the project.

Sec.2 B
103
   The risk based verification process is described in relation to the normal project phases:

Project initiation:
Conceptual design

Project realisation:
Detail design
Construction
Manufacturing of subsea facilities
Manufacturing and fabrication of subsea facilities components and assemblies
Installation
Project completion (pre-commissioning)
Commissioning
Issue of as-built/as-installed documentation, including Design Fabrication and Installation (DFI) resume

Project operation:
Issue of Operation Manuals
Operations, maintenance and repair

Project abandonment
Decommissioning
Removal

Sec.2
B 200   Simplified verification planning

Sec.2 B
201
   The steps in the simplified verification planning are as follows:
Use trigger questions to assess the overall risk level of the project (or manageable elements thereof).
Evaluate the risk against the relevant owner or project acceptance criteria (often this can be directly tied to the owner core values or a sub-set of these) and decide whether the general verification involvement shall be Low, Medium or High.
Use the example detailed scope of work tables in Appendix B to make a first draft of a Verification Plan
Generate the project specific Verification Plan by including a project specific engineering judgment or risk analysis to adjust the table to suit the project.
Perform the verification execution according to the Verification Plan, making revision to the plan if and when necessary.
Report the verification.


Sec.2 B
202
   The trigger questions are included in Appendix A.

Sec.2 B
203
   Generic scopes of work for verification at the three levels of verification; Low (L), Medium (M) and High (H), are given in the tables in this section.

Sec.2 B
204
   Project specific detailed scope of work descriptions, based on the generic scopes of work tables and showing all the activities to be verified, should be made. Examples of the level of detail are given in Appendix B.

Sec.2 B
205
   It is the tables in this section 2 that give the principle difference between the levels of verification involvement. The detailed example tables are to be treated as examples only. They shall not be used without a project specific confirmation of their completeness.

Sec.2 B
206
   The project specific scope of work definition, derived from the tables in Appendix B (or similar), shall be part of the final DNV verification report.

Sec.2
B 300   Selection of level of verification

Sec.2 B
301
   The selection of the level of verification for the simplified verification planning is facilitated by the trigger questions included in Appendix A.

Sec.2
B 400   Codes, standards and reference documents

Sec.2 B
401
   The verification process described in this DNV-OSS is not tailored to a specific technical standard, code or reference document.

Sec.2 B
402
   It is recommended to use internationally recognised codes or standards. Where combinations of standards and external criteria are used the exact terms of reference and documents to be issued shall be agreed at the beginning of the project and formally defined in the contract.

Sec.2 B
403
   It is recommended strongly not to mix standards due to the possible differences in safety philosophies.

Sec.2
C. Project Initiation

Sec.2
C 100   Verification during conceptual design

Sec.2 C
101
   Verification during the conceptual and/or feasibility studies of a project and in the early stages of a project can reduce the need for verification during the design and construction phases, and can reduce costs during the long term operation, inspection and maintenance phases.

Sec.2 C
102
   It is recommended to combine the mechanical design verification during project initiation phase with additional review of:
environmental aspects
project schedule
cost.


Sec.2 C
103
   During this phase it can be beneficial to make an initial verification plan. Risk evaluations are carried out during this phase and should be used to get an indication of the general verification level; Low, Medium or High.

Sec.2
D. Project Realization

Sec.2
D 100   General

Sec.2 D
101
   All design and construction aspects, relevant to subsea facility, may be covered by the life cycle verification.

Sec.2 D
102
   In this specification the split in the scope of work between design and construction is made between sets of requirements (specifications) developed during design and description of the steps necessary to satisfy the specification (procedures) showing how construction will be implemented.

Sec.2
D 200   Verification of overall project management

Sec.2 D
201
   Verification of the overall project management is the examination of the means of controlling the entire subsea development project, or the phase for which verification is undertaken.

Sec.2 D
202
   This verification should confirm that the necessary controls are in place to ensure information flow across the various interfaces. It is especially important where separate contractors have been employed for different phases of the project such as design and installation.

Sec.2 D
203
   Typically the documentation is expected to be in line with ISO 9000 requirements.

Sec.2 D
204
   Definition of scope of work for verification of overall project management should follow Table 2-1.

Sec.2 D
Table 2-1 Scope of work for verification of overall project management  
Verification activity Level 
Review of the project management process by    
review of project quality management documentation.
 
audit of project quality management system
 
 
review of sub-contractor control
 
 
review of interface controls
 
 
review of methods of information flow
 
 



Sec.2 D
205
   The verification of the overall project management quality system and documentation is optional. The reviews and audits should typically be performed if an extensive verification of a project is performed, while might be omitted for smaller sub-phase verifications.

Sec.2
D 300   Verification During Design

Sec.2 D
301
   Design verification is the examination of the assumptions, methods and results of the design process and is performed at the specified level of verification to ensure that the specified requirements of the subsea facility will be achieved.

Sec.2 D
302
   Design verification should consist of one, or some, of the following:
review of the design process,
review of specifications for design (Asset specifications),
review of design reports and drawings,
performing of independent parallel calculations,
review of specifications for construction and operation, resulting from design.


Sec.2 D
303
   The documents that shall be produced in the project should as a minimum satisfy the requirements of the selected code.

Sec.2 D
304
   Definition of scope of work for verification of design should follow Table 2-2.

Sec.2 D
Table 2-2 Scope of work for verification of design  
Verification activity Level 
Review of specifications for design by    
review of the design basis with emphasis on the design criteria
 
Review of design reports and drawings by    
review of the main documentation to ensure that the main load conditions have been accounted for in design, that the governing conditions are identified, and that the chosen design philosophies are in accordance with specified codes and standards
 
evaluation of the main methods used and spot checks of the input data and the calculation
results
 
 
detailed review of main design reports
 
  
Performing independent parallel calculations by    
check of pressure containment or overall
structural integrity
 
simplified independent analysis/calculation(s) performed by spot checks
 
 
advanced independent analysis/calculation(s) performed by spot checks
 
  
Review of specifications for construction and
operation by 
   
spot check of critical aspects
 
review of main specifications
 
 
thorough review of main specifications
 
  
Review of specific operational challenges (e.g. flow assurance    
general principles
 
review of main documents supported by simplified analyses
 
 

Sec.2
D 400   Verification During Construction

Sec.2 D
401
   The construction phase comprises fabrication, manufacturing, sub-unit / unit integration testing, installation and commissioning. An important element is to ensure that the contractual design requirements are incorporated in the purchase documentation, and that correct materials, joining and corrosion control, have been applied, and that pressure rating, capacity and function are meeting the requirements as per approved specifications and procedures. It is imperative that relevant preparations for this is started as early as possible, e.g. by the appointment of a vendor supply verification co-ordinator.

Sec.2 D
402
   Verification during construction is carried out by means of full time attendance, audits, inspection or spot checks of the work, as appropriate, in sufficient detail to ensure that the specified requirements of the subsea facility will be achieved.

Sec.2 D
403
   Verification of these activities relates not only to the contractor's work but also to the monitoring of this work carried out by others.

Sec.2 D
404
   During construction verification should consist of one, or some, of the following:
reviewing the construction process,
reviewing construction procedures,
reviewing qualification process,
surveillance during construction activities,
reviewing final documentation.


Sec.2 D
405
   The documents that should be produced in the project and submitted for review prior to start up are typically:
Manufacturing Procedure Specification (MPS)
Manufacturing procedures, including test requirements and acceptance criteria, repairs, personnel qualification records etc
Material specifications
Quality plans
Welding Procedure Specifications (WPS) / Welding Procedure Qualification Record (WPQR)
NDT procedures
Manufacturing Procedure Qualification Test (MPQT) results; and
Manufacturer's / fabricator's quality system manual


Sec.2 D
406
   Particularly for installation it is highly recommended to prepare a formal 'ready for start of installation' document to be verified prior to commencement.

Sec.2 D
407
   The "as-built" documentation to be submitted after manufacturing should include but not be limited to:
Manufacturing procedures including test requirements and acceptance criteria, repairs, personnel qualification records etc
Material certificates
Production test records (visual, NDT, test samples, dimensional, heat treatment etc.)
Hydrostatic test report
Commissioning report
Relevant statistics of chemical composition, mechanical properties and dimensions for the deliveries
Relevant logs


Sec.2 D
408
   Definition of scope of work for verification of manufacturing and fabrication Table 2-3 and Table 2-4 for installation and Table 2-5 for final testing and completion.

Sec.2 D
Table 2-3 Scope of work for verification of manufacturing and fabrication  
Verification activity Level 
Review of the manufacturing and fabrication process    
Review of manufacturing and fabrication management systems
 
Audit of the quality management system
 
 (x) 
Review of manufacturing and fabrication procedures    
Review manufacturing, fabrication and inspection procedures for confirmation of compliance with the manufacturing specification
 
Review method statements
 
 
Review of qualification process    
Review the Manufacturing Procedure Specification, (MPS), Manufacturing Procedure Qualification Test (MPQT), as applicable
 
Full time attendance during MPQT, as applicable, or first day production
 
 
Surveillance during manufacturing and fabrication activities    
Visit-based attendance during testing, to ensure, based on spot checks, that the delivered products have been produced in accordance with the
manufacturing specification
 
Visit-based or full-time attendance during manufacturing and fabrication to ensure, based on spot checks, that the delivered products have been produced in accordance with the
manufacturing specification
 
 
Full-time attendance during manufacturing and fabrication to ensure, based on spot checks, that the delivered products have been produced in
accordance with the manufacturing specification
 
  
Review of final documentation 

Sec.2 D
Table 2-4 Scope of work for verification of installation 
Verification activity Level 
Review of installation procedures    
Spot check of Installation Manual, (IM)
 
For critical operations (identified from the FMEA and HAZOP studies) review the IM
 
 
Review of qualification process    
For critical operations, review the qualification of the IM
 
Full time attendance during qualification tests, if applicable, or production start-up
 
 
Surveillance during installation activities    
Visit-based attendance during start up of each offshore operation (i.e. installation, completion, intervention works, etc).
 
Full time attendance during defined test and
trials
 
 
Review of final documentation 

Sec.2 D
Table 2-5 Scope of work for verification of final testing for operation, including as-built survey and project completion 
Verification activity Level 
 
Review of procedures     
Review of the procedures for infield tests and commissioning to ensure that the procedure
adequately covers the system in accordance with the design requirements
 
 
Surveillance during testing and completion activities     
Full time attendance during commissioning
 
  
Full time attendance during specific tests testing and audit based attendance during ongoing
testing
 
   
Review of test results
 
 
Review of final documentation     
Spot check of as-built documentation
 
 
Review of as-built documentation
 
   

Sec.2
E. Project Operation

Sec.2
E 100   Verification during operation

Sec.2 E
101
   Verification during operation is carried out by audit or spot check of the work in sufficient detail to ensure that the specified requirements of the subsea facilities continue to be achieved.

Sec.2 E
102
   Assessment of these activities will relate to the Owner's, as well as any contractor's, work.

Sec.2 E
103
   During operations, these assessments should consist of:
review of operations processes:
review of operations management systems,
audit of the quality management system, if necessary,
review of operations specifications and procedures:
confirmation of design assumptions,
method statements,
inspection plans,
inspection methods,
procedures for evaluation of inspection results,
attendance during operations activities:
attendance during inspections,
review of inspection records.


Sec.2 E
104
   In order to be able to carry out periodical surveys, the minimum documentation should include:
personnel responsible for the operation of the subsea facilities
history of the subsea facilities operation with reference to events that may have significance with respect to safety and functionality
installation condition data as required
physical and chemical characteristics of transported media including sand and sand detection measures
inspection and maintenance / intervention philosophy, schedules and records
inspection / intervention procedures and results as appropriate.


Sec.2 E
105
   Definition of verification of the operations phase should follow Table 2-6.

Sec.2 E
Table 2-6 Scope of work for verification of operations 
Verification activity Level 
General review of the main document(s) to check compliance with applicable design documentation.
Audit during repair and modification. 
Audit attendance during start-up of periodical survey, modification and repair activities. For critical aspects, as identified by the contract, audit attendance throughout the activities. Review of contractors' documentation of the survey/modification.  
Review of the main document(s) to check compliance with applicable codes and standards. Audit
attendance during start-up and performance of periodical survey, modification and repair activities. For critical aspects, as identified by the contract, full
attendance throughout the preparations of and the
activities. Issuing of independent confirmation
documentation of the survey/modification. 
  



Sec.2 E
106
   Verification during operations is carried out to confirm that the subsea facilities continue to meet the Owner's specified requirements.

Sec.2 E
107
   Annual assessments may be carried out to confirm that any deterioration of the subsea facilities are within acceptable limits and that the facilities continues to be fit for the intended purpose.



Sec.2 E
108
   Additional assessments should be carried out to confirm that any damage, deterioration or modification to the pipeline system or other systems does not render the subsea facilities unsuitable for the intended purpose.

Sec.2
F. Verification Documents

Sec.2
F 100   General

Sec.2 F
101
   The hierarchy of verification document is given in DNV-OSS-300 Appendix B. The descriptions of the content of these documents as well as examples of document forms are given in Appendix C to this specification.